Gantt, SC Murder Rates and Murder Maps

Murder per Capita in Gantt

The map below shows murder per 1,000 Gantt residents.

 

Gantt, SC Map of Murder Rates
Click the map to explore
A+ B C D F
Safest Highest crime
Colorblind friendly off

Crime Grade's murder map shows the safest places in Gantt in green. The most dangerous areas in Gantt are in red, with moderately safe areas in yellow. Crime rates on the map are weighted by the type and severity of the crime.

Is Gantt, SC Safe from Murder?

The D- grade means the rate of murder is much higher than the average US city. Gantt is in the 12th percentile for safety, meaning 88% of cities are safer and 12% of cities are more dangerous. This analysis applies to Gantt's proper boundaries only. See the table on nearby places below for nearby cities.

The rate of murder in Gantt is 0.1265 per 1,000 residents during a standard year. People who live in Gantt generally consider the northwest part of the city to be the safest.

Your chance of being a victim of murder in Gantt may be as high as 1 in 6,042 in the southwest neighborhoods, or as low as 1 in 14,096 in the northwest part of the city.

By a simple count ignoring population, more murder occurs in the south parts of Gantt, SC: about 0 per year. The north part of Gantt has fewer cases of murder with only 0 in a typical year.

How Gantt's Murder Rate Compares

The chart below compares the murder rate in Gantt to the South Carolina state average and the national average. All rates are the number of crimes per 1,000 residents in a standard year.

Gantt, SC: 0.1265
South Carolina: 0.1098
USA: 0.0671

Considering only the murder rate, Gantt is less safe than the South Carolina state average and less safe than the national average.

See how CrimeGrade calculates these grades and rates on the CrimeGrade methodology page.

The Cost of Murder in Gantt, SC

Murder is projected to cost the residents of Gantt about $3,081,024 in 2025, or roughly $238 per resident. This is part of Gantt's overall Cost of Crime™. See the full cost-of-crime breakdown for Gantt, including every crime type and how Gantt compares to other cities.

Interpreting the Murder Map

Remember that murder rates are measured per resident. Places with heavy daytime traffic, like shopping districts, airports, and parks, can look more dangerous than they are for the people who live there. See a full guide to reading Gantt's crime maps on the Gantt overall crime page.

To better understand and navigate these intricate crime maps, a high-speed internet connection can be crucial. Fast and seamless online connectivity ensures that map details load efficiently, providing users with clearer, uninterrupted insights. If you're considering enhancing your online experience, check out high speed internet in Gantt, SC at ISP Reports.

Murder Maps and Rates for Nearby Cities

Compared to surrounding cities, the rate of murder in Gantt is higher. The table below shows Crime Grades for cities close to Gantt.

Nearby City
Overall Crime Grade
Violent Crime Grade
Property Crime Grade
Murder Crime Grade
F
F
F
D+
F
D-
D-
D+
D
D+
D
C-
F
F
F
D
D-
C+
D
B+
D
D
D+
D+
D-
C+
D
C+
F
D-
D-
B-
D-
D
D
C
C
B
C+
B

Murder in City with Similar Populations

Gantt is higher versus other cities of the same size for murder. The table below compares murder in cities with comparable overall population.

Similar City
Overall Crime Grade
Violent Crime Grade
Property Crime Grade
Murder Crime Grade
A+
A-
A-
A+
C
D+
D+
C+
F
F
F
F
D
D
D
C-
A-
A
A
A+
A
A
A
A+
A-
A-
A-
A
A-
B-
B-
A
B-
B
B
B+
A+
A+
A+
C+

Safety and school performance are separate topics, but both shape moving decisions. Using SchoolGrade data, schools in Gantt, SC average SchoolGrade of B+, with 48% actual proficiency versus 41% projected; overall, schools greatly exceed expectations. See Gantt schools on SchoolGrade

About the Data

CrimeGrade.org provides highly detailed and accurate crime data, used by insurance companies, home security firms, and other industries. Our data is available for licensing—learn more about our USA crime data and licensing.

Crime By Zip Code Download

Our proprietary data is available for download by zip code or by state in a CSV Flat File. Please visit our download page for pricing and terms.

Download CSV

 

Home Security

Your home is 300% more likely to be robbed with no home security system. Want to protect your home?

Home Security Companies in Gantt, SC

All maps and statistics above are projections, not certainties, and provided without guarantee free of charge. Verify all info before making any decisions based on the data.