Gantt, AL Vandalism Rates and Vandalism Maps

Vandalism per Capita in Gantt

The map below shows vandalism per 1,000 Gantt residents.

 

Gantt, AL Map of Vandalism Rates
Click the map to explore
A+ B C D F
Safest Highest crime
Colorblind friendly off
1 in 368

Your yearly chance of being a victim of vandalism in Gantt is about 1 in 368.

$19

Vandalism costs the average Gantt resident about $19 per year.

Best Home Security Systems in Gantt, AL

Crime Grade's vandalism map shows the safest places in Gantt in green. The most dangerous areas in Gantt are in red, with moderately safe areas in yellow. Crime rates on the map are weighted by the type and severity of the crime.

Is Gantt, AL Safe from Vandalism?

The B grade means the rate of vandalism is slightly lower than the average US city. Gantt is in the 66th percentile for safety, meaning 34% of cities are safer and 66% of cities are more dangerous. This analysis applies to Gantt's proper boundaries only. See the table on nearby places below for nearby cities.

The rate of vandalism in Gantt is 2.720 per 1,000 residents during a standard year. People who live in Gantt generally consider the north part of the city to be the safest.

Your chance of being a victim of vandalism in Gantt may be as high as 1 in 190 in the northwest neighborhoods, or as low as 1 in 536 in the north part of the city.

By a simple count ignoring population, more vandalism occurs in the northwest parts of Gantt, AL: about 1 per year. The east part of Gantt has fewer cases of vandalism with only 0 in a typical year.

How Gantt's Vandalism Rate Compares

The chart below compares the vandalism rate in Gantt to the Alabama state average and the national average. All rates are the number of crimes per 1,000 residents in a standard year.

Gantt, AL: 2.720
Alabama: 5.400
USA: 4.647

Considering only the vandalism rate, Gantt is safer than the Alabama state average and safer than the national average.

See how CrimeGrade calculates these grades and rates on the CrimeGrade methodology page.

The Cost of Vandalism in Gantt, AL

Vandalism is projected to cost the residents of Gantt about $11,541 in 2025, or roughly $19 per resident. This is part of Gantt's overall Cost of Crime™. See the full cost-of-crime breakdown for Gantt, including every crime type and how Gantt compares to other cities.

Interpreting the Vandalism Map

Remember that vandalism rates are measured per resident. Places with heavy daytime traffic, like shopping districts, airports, and parks, can look more dangerous than they are for the people who live there. See a full guide to reading Gantt's crime maps on the Gantt overall crime page.

To better understand and navigate these intricate crime maps, a high-speed internet connection can be crucial. Fast and seamless online connectivity ensures that map details load efficiently, providing users with clearer, uninterrupted insights. If you're considering enhancing your online experience, check out high speed internet in Gantt, AL at ISP Reports.

Vandalism Maps and Rates for Nearby Cities

Compared to surrounding cities, the rate of vandalism in Gantt is lower. The table below shows Crime Grades for cities close to Gantt.

Nearby City
Overall Crime Grade
Violent Crime Grade
Property Crime Grade
Vandalism Crime Grade
D+
C
D+
C
C-
B-
C-
C
C
C
C+
D+
C+
B-
B
C+
C
C+
B-
D+
C
B
C+
B
B-
C
A+
C-
C-
C
C
C-
C
B-
C+
C+
C
C+
B-
D+

Vandalism in City with Similar Populations

Gantt is lower versus other cities of the same size for vandalism. The table below compares vandalism in cities with comparable overall population.

Similar City
Overall Crime Grade
Violent Crime Grade
Property Crime Grade
Vandalism Crime Grade
A+
B+
B+
A+
D-
F
F
F
A
A
A
A-
A
A
A
B
C-
D
D
B-
A
C-
C-
B+
D+
D
D
A
C+
D+
D+
C+
A
A+
A+
A-
D-
D+
D+
F

Safety and school performance are separate topics, but both shape moving decisions. Using SchoolGrade data, schools in Gantt, AL average SchoolGrade of C+, with 38% actual proficiency versus 37% projected; overall, schools meet expectations. See Gantt schools on SchoolGrade

About the Data

CrimeGrade.org provides highly detailed and accurate crime data, used by insurance companies, home security firms, and other industries. Our data is available for licensing—learn more about our USA crime data and licensing.

Crime By Zip Code Download

Our proprietary data is available for download by zip code or by state in a CSV Flat File. Please visit our download page for pricing and terms.

Download CSV

 

Home Security

A vandalism occurs on average every 225.9 days in Gantt. Your home is 300% more likely to be robbed with no home security system. Want to protect your home?

Home Security Companies in Gantt, AL

All maps and statistics above are projections, not certainties, and provided without guarantee free of charge. Verify all info before making any decisions based on the data.