Cost of Crime™ for Gantt, SC
$12.4 million
In 2025, crime will cost $2,738 per household.
More cost data
Put this on your site: embed the map, grade card or badge.
On the map, green marks the parts of Gantt with the least crime overall and red marks the most. Each area is weighted by the type and severity of every offense, so a place with rare but serious violent crime can grade differently from one with frequent petty theft. The Interpreting the Crime Maps section below explains how to read the colors.
Is Gantt, SC Safe?
The F overall grade blends the violent, property, and other grades shown above into one measure, set against the average US city, where Gantt's combined rate is much higher than the norm. Gantt sits in the 4th percentile, ahead of 4% of cities and behind 96%. The grade covers only Gantt's official city boundaries. See the table below for nearby cities.
The overall crime rate in Gantt is 66.45 per 1,000 residents in a typical year. Residents generally consider the northwest part of the city the safest. Your chance of being a victim ranges from 1 in 13 in the southeast neighborhoods to 1 in 21 in the northwest.
Counting total incidents instead of per-capita rates, the south parts of Gantt, SC report the most crime, about 186 cases per year. The north part reports the fewest, around 25 per year.
The Cost of Crime™ in Gantt, SC
Across all crime types, the projected cost of crime in Gantt for 2025 is $12,399,393, about $957 per resident and $2,738 per household. That equals 3.0% of the median household income.
These figures cover tangible costs, which include:
- Criminal justice system costs (law enforcement, courts, and imprisonment): 55.1%
- Direct costs to victims (damaged property, medical expenses, and lost wages): 33.6%
- Lost economic contribution from offenders (time in prison or repeat offenses): 11.2%
How Much Does Crime Cost in Gantt Compared to Other Cities?
| Gantt, SC: |
$957
|
| Denmark, SC: |
$1981
|
| Little River, SC: |
$310
|
| South Carolina: |
$666
|
| USA: |
$464
|
The overall cost of crime per resident in Gantt is $957 per year, which is $493 more than the national average and $291 more than South Carolina's state average. The comparison below uses cities similar to Gantt:
- In Denmark, SC, crime costs $1,981 per person, which is $1,023 more than in Gantt.
- In Little River, SC, crime costs $310 per person, which is $647 less than in Gantt
2025 Projected Cost by Type of Crime
The table below shows the total cost of crime to the residents of Gantt for the year 2025 along with the projected cost per resident.
Crime |
Cost to Gantt |
Cost per Gantt Resident |
Murder |
$3.08 million |
$238 |
Rape/Sexual Assault |
$583,810 |
$45 |
Robbery |
$210,551 |
$16 |
Assault |
$3.29 million |
$254 |
Kidnapping |
$204,706 |
$16 |
Vehicle Theft |
$556,191 |
$43 |
Burglary |
$816,658 |
$63 |
Theft |
$1.80 million |
$139 |
Arson |
$45,320 |
$3 |
Vandalism |
$1.04 million |
$81 |
Animal Cruelty |
$9,918 |
$1 |
Drug Crimes |
$718,165 |
$55 |
Identity Theft |
$36,248 |
$3 |
Total Cost of Crime |
$12,399,393 |
$957 |
The Intangible Cost of Crime in Gantt, SC
The totals above count tangible costs only. Violent crime also carries a human cost, the pain and trauma borne by victims and their families, which research-based methods estimate so it can be compared across places.
That intangible cost in Gantt totals $24,121,282 ($1,862 per resident), and all of it comes from violent crime rather than property loss. Added to the tangible costs, the full estimate reaches $36,520,675 ($2,819 per resident).
All Cost of Crime figures come from scholarly research on the cost of crime. Read more about our methodology here.
Interpreting the Crime Maps
Crime rates on the map are measured per resident, so areas with heavy visitor traffic can read high because crime follows crowds, even where few people live. The south part of the city holds more retail establishments, which lifts recorded crime around those blocks. A red area does not always mean the neighborhood is unsafe for residents.
Airports, parks, and transit hubs create the same effect. Major airports draw large crowds with few residents nearby, so they read as high-crime spots. Parks and recreational areas do the same, and of Gantt's 12,956 residents few live beside them. Before assuming an area is unsafe, weigh both the per-capita rate and the total number of incidents, and note what sits nearby.
The interactive maps load faster on a strong connection. Compare high speed internet in Gantt, SC at ISP Reports.
Gantt Crime Breakdown
The tables below show which crimes are used to calculate the Crime Grades above. All crime rates are shown as the number of crimes per 1,000 Gantt residents in a standard year.
Violent Crime Rates
Crime Type |
Crime Rate |
Assault |
8.844 |
Robbery |
0.5167 |
Rape |
0.7432 |
Murder |
0.1265 |
Total Violent Crime |
10.23 (F) |
|
|
Property Crime Rates
Crime Type |
Crime Rate |
Theft |
26.85 |
Vehicle Theft |
2.772 |
Burglary |
6.950 |
Arson |
0.1448 |
Total Property Crime |
36.72 (F) |
|
|
Other Crime Rates
Crime Type |
Crime Rate |
Kidnapping |
0.2606 |
Drug Crimes |
7.494 |
Vandalism |
11.28 |
Identity Theft |
0.3615 |
Animal Cruelty |
0.1035 |
Total "Other" Rate |
19.50 (F) |
Crime Maps and Rates for Nearby Cities
Compared to surrounding cities, the rate of crime in Gantt is higher. The table below shows Crime Grades for cities close to Gantt.
Nearby City | Overall Crime Grade | Violent Crime Grade | Property Crime Grade |
|---|
| F | F | F |
| F | D- | D- |
| D | D+ | D |
| F | F | F |
| D- | C+ | D |
| D | D | D+ |
| D- | C+ | D |
| F | D- | D- |
| D- | D | D |
| C | B | C+ |
Crime Maps and Rates for City with Similar Populations
Gantt is higher versus other cities of the same size for crime. The table below compares crime in cities with comparable overall population in the city‘s boundaries.
Similar City | Overall Crime Grade | Violent Crime Grade | Property Crime Grade |
|---|
| A+ | A- | A- |
| C | D+ | D+ |
| F | F | F |
| D | D | D |
| A- | A | A |
| A | A | A |
| A- | A- | A- |
| A- | B- | B- |
| B- | B | B |
| A+ | A+ | A+ |
Considering only the crime rate, Gantt is less safe than the South Carolina state average and less safe than the national average.
Safety and school performance are separate topics, but both shape moving decisions. Using SchoolGrade data, schools in Gantt, SC average SchoolGrade of B+, with 48% actual proficiency versus 41% projected; overall, schools greatly exceed expectations. See Gantt schools on SchoolGrade
About the Data
CrimeGrade.org provides highly detailed and accurate crime data, used by insurance companies, home security firms, and other industries. Our data is available for licensing—learn more about our USA crime data and licensing.
Crime By Zip Code Download
Our proprietary data is available for download by zip code or by state in a CSV Flat File. Please visit our download page for pricing and terms.
Download CSV
Home Security
A crime occurs on average every 10 hours 10 minutes in Gantt. Want to protect your home?
Home Security Companies in Gantt, SC
All maps and statistics above are projections, not certainties, and provided without guarantee free of charge. Verify all info before making any decisions based on the data.