Theft per Capita in Gantt
The map below shows theft per 1,000 Gantt residents.
The map below shows theft per 1,000 Gantt residents.
C
Theft Grade™
C |
|
B |
|
C+ |
Your yearly chance of being a victim of theft in Gantt is about 1 in 97.
Theft costs the average Gantt resident about $54 per year.
Crime Grade's theft map shows the safest places in Gantt in green. The most dangerous areas in Gantt are in red, with moderately safe areas in yellow. Crime rates on the map are weighted by the type and severity of the crime.
The C grade means the rate of theft is slightly higher than the average US city. Gantt is in the 41st percentile for safety, meaning 59% of cities are safer and 41% of cities are more dangerous. This analysis applies to Gantt's proper boundaries only. See the table on nearby places below for nearby cities.
The rate of theft in Gantt is 10.36 per 1,000 residents during a standard year. People who live in Gantt generally consider the northwest part of the city to be the safest.
Your chance of being a victim of theft in Gantt may be as high as 1 in 90 in the south neighborhoods, or as low as 1 in 122 in the northwest part of the city.
By a simple count ignoring population, more theft occurs in the central parts of Gantt, AL: about 1 per year. The east part of Gantt has fewer cases of theft with only 0 in a typical year.
The chart below compares the theft rate in Gantt to the Alabama state average and the national average. All rates are the number of crimes per 1,000 residents in a standard year.
| Gantt, AL: | 10.36 |
|---|---|
| Alabama: | 11.02 |
| USA: | 13.00 |
Considering only the theft rate, Gantt is as safe as the Alabama state average and safer than the national average.
See how CrimeGrade calculates these grades and rates on the CrimeGrade methodology page.
Theft is projected to cost the residents of Gantt about $31,869 in 2025, or roughly $54 per resident. This is part of Gantt's overall Cost of Crime™. See the full cost-of-crime breakdown for Gantt, including every crime type and how Gantt compares to other cities.
Remember that theft rates are measured per resident. Places with heavy daytime traffic, like shopping districts, airports, and parks, can look more dangerous than they are for the people who live there. See a full guide to reading Gantt's crime maps on the Gantt overall crime page.
To better understand and navigate these intricate crime maps, a high-speed internet connection can be crucial. Fast and seamless online connectivity ensures that map details load efficiently, providing users with clearer, uninterrupted insights. If you're considering enhancing your online experience, check out high speed internet in Gantt, AL at ISP Reports.Compared to surrounding cities, the rate of theft in Gantt is higher. The table below shows Crime Grades for cities close to Gantt.
Nearby City | Overall Crime Grade | Violent Crime Grade | Property Crime Grade | Theft Crime Grade |
|---|---|---|---|---|
D+ | C | D+ | D | |
C- | B- | C- | C- | |
C | C | C+ | B- | |
C+ | B- | B | B- | |
C | C+ | B- | B- | |
C | B | C+ | C+ | |
B- | C | A+ | A+ | |
C- | C | C | B- | |
C | B- | C+ | C | |
C | C+ | B- | B+ |
Gantt is higher versus other cities of the same size for theft. The table below compares theft in cities with comparable overall population.
Similar City | Overall Crime Grade | Violent Crime Grade | Property Crime Grade | Theft Crime Grade |
|---|---|---|---|---|
A+ | B+ | B+ | A | |
D- | F | F | D+ | |
A | A | A | A | |
A | A | A | A- | |
C- | D | D | C- | |
A | C- | C- | A+ | |
D+ | D | D | D | |
C+ | D+ | D+ | C+ | |
A | A+ | A+ | B+ | |
D- | D+ | D+ | C- |
Safety and school performance are separate topics, but both shape moving decisions. Using SchoolGrade data, schools in Gantt, AL average SchoolGrade of C+, with 38% actual proficiency versus 37% projected; overall, schools meet expectations. See Gantt schools on SchoolGrade
CrimeGrade.org provides highly detailed and accurate crime data, used by insurance companies, home security firms, and other industries. Our data is available for licensing—learn more about our USA crime data and licensing.
Our proprietary data is available for download by zip code or by state in a CSV Flat File. Please visit our download page for pricing and terms.
Download CSV
A theft occurs on average every 59.3 days in Gantt. Your home is 300% more likely to be robbed with no home security system. Want to protect your home?
Home Security Companies in Gantt, AL
All maps and statistics above are projections, not certainties, and provided without guarantee free of charge. Verify all info before making any decisions based on the data.